Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USACE MDC Assisting in the Procurement of New Dredge
Business & Finance

December 12, 2019 · about 6 years ago

USACE MDC Assisting in the Procurement of New Dredge

The U.S. Army Corps of Engineers’ Marine Design Center is managing the procurement of a dredge for the nation of Azerbaijan, as part of a broader U.S. Department of Defense program to enhance Azerbaijan’s maritime security. The dredge will enable the Coast Guard of the State Border Service to operat

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers’ Marine Design Center is managing the procurement of a dredge for the nation of Azerbaijan, as part of a broader U.S. Department of Defense program to enhance Azerbaijan’s maritime security.

The dredge will enable the Coast Guard of the State Border Service to operate its fleet of vessels and maintain access to the harbor entrance and shipping channels of ports located in the Caspian Sea.

The MDC, based in Philadelphia, is the Army Corps’ center of expertise for naval architecture and marine engineering. It manages the design and construction of barges, workboats, floating cranes, dredges and other vessels for USACE and other federal agencies.

“ MDC was very happy to assist the Navy with this exciting project, as it drew upon our expertise with dredging equipment and floating plant procurement to meet the project’s tight schedule and unique in-country mission requirements ,” said USACE MDC Director Brian Murtaugh .

When complete, the new cutter suction dredge will be used to maintain the harbor entrance and shipping channels of State Border Service Coast Guard ports in the Caspian Sea.

The 50-foot vessel will be designed to dredge to a maximum depth of 20 feet with a 42 horsepower cutterhead and pump the sediment through over 3,500 feet of floating discharge pipe.

The dredge will be equipped with two spuds, two swing winches and two anchors to facilitate the positioning and dredging operations.

All dredge functions will be powered by a single CAT C13, 440 horsepower rated engine, with a hydraulic system filled with U.S. EPA environmentally acceptable fluids.

In September 2019, MDC awarded a $1.2 million contract to DSC Dredge, a small business based in New Orleans, to design and construct the cutter suction dredge.

The contract will be administered in three phases. The first phase is ongoing now and includes engineering and design. The second phase includes construction and testing at the manufacturer facility in New Orleans and the third phase includes re-assembly and testing in Azerbaijan.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago