Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Inland Dredging Wraps Up Work on Ten Memphis District Harbors
Business & Finance

January 7, 2020 · about 6 years ago

Inland Dredging Wraps Up Work on Ten Memphis District Harbors

The U.S. Army Corps of Engineers’ Memphis District has several missions associated with the Mississippi River. One of the most important is to keep the river channel at a depth that allows the river barge industry to dependably transport goods up and down the river. To deliver on this charge, the Me

2 minutes read
  • LinkedIn
  • X
  • Email
Inland Dredging Wraps Up Work on Ten Memphis District Harbors

The U.S. Army Corps of Engineers’ Memphis District has several missions associated with the Mississippi River. One of the most important is to keep the river channel at a depth that allows the river barge industry to dependably transport goods up and down the river.

To deliver on this charge, the Memphis District awarded a contract/task order in the amount of $7,987,200 to the Inland Dredging Company in April of 2019.

On December 23, 2019, Inland Dredging Co. completed all work with a total of 1,289,598 cubic yards of sediment dredged from all 10 Memphis District Harbors.

“The contract funded the mobilization, demobilization, downstream and upstream towing, as well as the dredging itself for all 10 harbors,” Operations Project Manager Vickie L. Watson said. “They [Inland Dredging Co.] started in July [2019] in the Memphis Harbor/McKellar Lake with a focus on the mouth of the harbor because that’s where we seem to have the most sediment.”

Harbors dredged included the Elvis Stahr Harbor, Northwest Tennessee Regional Harbor, New Madrid Harbor Mile 889, New Madrid County Harbor, Caruthersville Harbor, Osceola Harbor, Helena Harbor, Helena Harbor Phillips County, Wolf River Harbor, and the Memphis Harbor/McKellar Lake.

All 10 harbors have been dredged annually since 2015. This becomes particularly important during high-water events like earlier in 2019.

“Every harbor was affected by the high water, but because we have dredged every year over the last four years, it was easy to remove the sediment that was placed,” Watson noted. “We didn’t have any flood-related damages in our harbors and that’s because of the maintenance work we do every year.”

Maintenance efforts go a long way in ensuring river traffic runs as smoothly as possible, and dredging is one key function the Memphis District prioritizes.

“These harbors serve as vital links to rail and highway transportation systems in the region, helping to deliver products and commodities to and from global markets,” Watson explained. “Without regular maintenance dredging, barges eventually couldn’t make their way up and down the river and in and out of the harbors as needed – this is why we [USACE] dredge and why it is so important to do so.”

By Jessica Haas, Public Affairs Specialist, Memphis District

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago