Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Botswana: K.Hill Feasibility Study Kicks Off
Business & Finance

January 14, 2020 · about 6 years ago

Botswana: K.Hill Feasibility Study Kicks Off

Giyani Metals Corp. yesterday announced the commencement of the feasibility study for its K.Hill manganese deposit in Botswana with positive initial feedback from SRK, Tetra Tech and Royal IHC after their three-day site visit to K.Hill in late December 2019. Following the successful FS bid from SRK

1 minutes read
  • LinkedIn
  • X
  • Email
Botswana: K.Hill Feasibility Study Kicks Off

Giyani Metals Corp. yesterday announced the commencement of the feasibility study for its K.Hill manganese deposit in Botswana with positive initial feedback from SRK, Tetra Tech and Royal IHC after their three-day site visit to K.Hill in late December 2019.

Following the successful FS bid from SRK Consulting and joint bid from Tetra Tech and Royal IHC, that was announced on December 13, 2019, Giyani organized a three-day site visit for the team of consultants, who will be the project leads for their respective practices to survey the K.Hill project area.

The aim was to provide them with first-hand experience of the location, terrain, infrastructure and various other aspects related to the overall project.

During the site visit, the team surveyed the K.Hill deposit, and the surrounding area to consider potential locations for the mine, processing plant, waste rock and tailings facilities. The team also assessed the area’s infrastructure to develop an initial understanding of the requirements to build and operate the K.Hill project.

Additionally, the team inspected the drill hole locations from the 2018 resource drilling program and considered potential drill hole locations for the infill drilling program for 2020.

Another aspect the team considered during the site visit was any potential benefits and impacts of the K.Hill project on the town of Kanye, which will be examined in detail in the environmental and social impact assessment to be run in parallel with the FS.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago