Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›A&P Tees Extending the Life of TSHD Heortnesse
Business & Finance

January 17, 2020 · about 6 years ago

A&P Tees Extending the Life of TSHD Heortnesse

The team at A&P Tees is currently extending the life of the trailing suction hopper dredger Heortnesse, which maintains the navigable depth in the ports of Tees and Hartlepool, by up to 17 years. According to the A&P, the work is being carried out over two dockings – the first of which was completed

2 minutes read
  • LinkedIn
  • X
  • Email
A&P Tees Extending the Life of TSHD Heortnesse

The team at A&P Tees is currently extending the life of the trailing suction hopper dredger Heortnesse, which maintains the navigable depth in the ports of Tees and Hartlepool, by up to 17 years.

According to the A&P, the work is being carried out over two dockings – the first of which was completed two weeks ahead of schedule in October. The second will take place early this year.

Following detailed analysis of the dredger’s structure and systems, it was concluded that renewal and refurbishment works would allow the vessel to continue its duties in an effective and resilient manner for in excess of 15 years, the company reported.

A&P Tees began the fabrication and preparation works well in advance of the 40-year old dredger’s arrival in dock to ensure the quick turnaround required by the client, PD Ports.

The program of works included changing the propulsion drives to allow the vessel to operate on two generators instead of the three currently required. This will provide significant long-term gain in relation to fuel consumption and the subsequent environmental benefits.

In total 30t of steel was renewed including coaming shells, cross bracings, pipework and platforms. The deck-dredge hydraulics and control systems, as well as the alarm and communications systems were also renewed.

The dredge system was also refurbished with a new dredge pump, dredge pipework, densitometer and dredge monitoring system installed. The bottom doors, including rams and linkages, and accommodation spaces were also refurbished and some external coatings repainted.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago