Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Bay Denesse Restoration Project Underway
Business & Finance

January 27, 2020 · about 6 years ago

Bay Denesse Restoration Project Underway

Ducks Unlimited is working to restore 2,550 acres of coastal marsh approximately 2.5 miles northeast of Buras, Louisiana. The project will combine coastal restoration techniques of marsh terraces and crevasses to optimize sediment capture from the Mississippi River. Wetlands adjacent to the Mississi

1 minutes read
  • LinkedIn
  • X
  • Email
Bay Denesse Restoration Project Underway

Ducks Unlimited is working to restore 2,550 acres of coastal marsh approximately 2.5 miles northeast of Buras, Louisiana.

The project will combine coastal restoration techniques of marsh terraces and crevasses to optimize sediment capture from the Mississippi River.

Wetlands adjacent to the Mississippi River have suffered extensive deterioration over the past century.

Historically, the Mississippi River had many distributary channels that connected nutrient and sediment rich waters of the river with marshes of the Barataria and Breton Sound Basins. The river also overtopped its banks during flood events, which helped nourish the surrounding marshes with sediment.

Due to flood control and navigation needs, federal efforts to contain the river with levees were initiated in the late 1800s and continue to this day.

The containment of the river, coupled with other sources of wetland loss (i.e., subsidence, shoreline erosion, salt water intrusion, etc.), have had detrimental impacts to the marshes flanking the river.

This project area is located south of the Mississippi River flood control levee system and is still hydrologically connected to the river. Thus, it is an ideal location to enhance river water distribution to create wetlands.

This project will restore and enhance 2,550 acres by converting open water into various habitat types, including mud/sand flats, shallow water ponds, aquatic vegetation beds, and emergent marsh.

It will also nourish existing marshes within the project area.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago