Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›TSHD Anchorage Launched in Harlingen
Business & Finance

January 27, 2020 · about 6 years ago

TSHD Anchorage Launched in Harlingen

Thecla Bodewes Shipyards launched the 3000m³ trailing suction hopper dredger (TSHD) Anchorage in Harlingen last Friday. This dredger is equipped with a smart diesel-electric system, developed in close collaboration between Barkmeijer Shipyards and D&A Electric, that efficiently regulates the energy

2 minutes read
  • LinkedIn
  • X
  • Email
TSHD Anchorage Launched in Harlingen

Thecla Bodewes Shipyards launched the 3000m³ trailing suction hopper dredger (TSHD) Anchorage in Harlingen last Friday.

This dredger is equipped with a smart diesel-electric system, developed in close collaboration between Barkmeijer Shipyards and D&A Electric, that efficiently regulates the energy supply for sailing, dredging and unloading the ship.

As a result, energy and fuel consumption is optimized and the ship’s emissions are greatly reduced.

For the control and monitoring of the dredging process, Barkmeijer Shipyards in collaboration with some of the Netherlands leading system specialists, has developed an intelligent automation package to not only provide high dredging performance but enable the dredging, sailing and maintenance operations to be handled by a limited crew of only 7-8 members.

This TSHD has been built especially for extracting sand and gravel at sea, with a capacity of 3,000m³ per hour.

An underwater pump, mounted in the suction pipe, brings the sand / gravel mixture to a sieve, which separates the sand and gravel and deposits the the preferred cargo into the hopper (cargo hold of the dredger) and discharges the unwanted material back into the sea. Then during the trip to the port of discharge, the water is removed from sand or gravel, so that the cargo can be unloaded “dry” by the ship’s onboard ship-to-shore discharge system.

This dredger has a length of 105.90 meters, is 15.85 meters wide and has a draft of 6.94 meters with ample accommodation on board for 14 crew members.

It was developed in the Netherlands and built in collaboration with Dutch suppliers, mainly from the north of the Netherlands.

The design and construction of the dredger, build number 347, was undertaken by Barkmeijer Shipyards in Stroobos, part of the Thecla Bodewes Shipyards Group. In April 2019 the hull was towed to their shipyard in Harlingen, where the ship was completed by order of De Hoop Terneuzen B.V.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & FinanceVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

13 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

14 days ago