Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Twin Dyke – Building with Nature for Multiple Benefits
Business & Finance

March 25, 2020 · about 6 years ago

Twin Dyke – Building with Nature for Multiple Benefits

The obvious solution to a sea defense problem is usually the easiest one to accept, because it’s indeed so obvious. If a sea dyke is not strong enough for the consequences of future climate change, then it should be reinforced to meet the new requirements. However, beside an estuary on the southern

1 minutes read
  • LinkedIn
  • X
  • Email
Twin Dyke – Building with Nature for Multiple Benefits

The obvious solution to a sea defense problem is usually the easiest one to accept, because it’s indeed so obvious.

If a sea dyke is not strong enough for the consequences of future climate change, then it should be reinforced to meet the new requirements.

However, beside an estuary on the southern shoreline of the Wadden Sea, the regional water authority and the provincial government proposed a daring, innovative solution that costs less, is nature-friendly, and potentially brings many additional benefits to the area.

Completed in early 2020, the Twin Dyke is a test bed for a Nature Based approach to coastal flood protection.

Higher, wider, stronger

Much of the Dutch coastline is protected by dykes that were constructed long before anyone had ever heard of Climate Change, and a massive program of works is now underway to upgrade the country’s flood defenses.

During the past five years, Regional Water Authority (RWA) Noorderzijlvest has reinforced 12 km of sea dyke between Delfzijl and Eemshaven beside the Wadden Sea, on the north-eastern coast of the Province of Groningen.

In this project the existing sea dyke had to be raised, widened, and strengthened to withstand wave action resulting from higher sea levels and storm surges.

But over one section of the dyke, in cooperation with the province of Groningen, the RWA took a totally different approach.

To read the full story, please click here .

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago