Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Old Saybrook Project on Display
Business & Finance

April 8, 2020 · about 6 years ago

Old Saybrook Project on Display

Lynde Point Land Trust, Inc., is seeking a permit from the USACE New England District to conduct work in waters of the U.S. in conjunction with stabilizing long-term shoreline erosion and protecting Lynde Point Marsh in Old Saybrook, Connecticut. This work is proposed in Long Island Sound and Crab C

2 minutes read
  • LinkedIn
  • X
  • Email
Old Saybrook Project on Display

Lynde Point Land Trust, Inc., is seeking a permit from the USACE New England District to conduct work in waters of the U.S. in conjunction with stabilizing long-term shoreline erosion and protecting Lynde Point Marsh in Old Saybrook, Connecticut.

This work is proposed in Long Island Sound and Crab Creek east and northeast of 6 Mohegan Avenue in Old Saybrook.

The work involves the discharge of fill material, both temporary and permanent, consisting of soil and rock associated with northerly relocation of Crab Creek, filling of the old tidal creek and cross-culvert abandonment in place under Mohegan Avenue, construction of intertidal stone sills, creation of tidal wetland habitat and reestablishment and expansion of coastal dune features.

The reconfiguration of Crab Creek is designed to prevent tidal blockages and the placement of fill as a “living shoreline” is proposed to attenuate waves that are causing shoreline erosion and barrier beach migration northward.

A total of 710 square feet of tidal wetland will be converted to dry land with placement of 63 cubic yards of sand for expansion of a coastal dune. In all, the proposed work will result in a discharge of fill material and associated grading with permanent impacts over a 34,750-square-foot (0.80 acre) area of unvegetated intertidal and subtidal habitat and a 710-square-foot (0.016 acre) area of tidal wetland.

The work will also include 8,300 square feet of temporary fill associated with best management practices.

The purpose of the proposed work is to stabilize the long-term shoreline erosion and protect Lynde Point Marsh, Crab Creek, Mohegan Avenue and the adjacent salt pond from the more frequent storms that threaten these features.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago