Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Mackley Returns to Shoreham for More Works
Business & Finance

May 13, 2020 · about 6 years ago

Mackley Returns to Shoreham for More Works

Mackley has returned to the West Sussex town of Shoreham to re-construct a river wall on the northern bank of the River Adur. The project is being carried out as part of a package of enabling works for Wates Residential – ahead of the construction of 500 residential units. To date works have compris

1 minutes read
  • LinkedIn
  • X
  • Email
Mackley Returns to Shoreham for More Works

Mackley has returned to the West Sussex town of Shoreham to re-construct a river wall on the northern bank of the River Adur.

The project is being carried out as part of a package of enabling works for Wates Residential – ahead of the construction of 500 residential units.

To date works have comprised of the installation of 250 continuous flight auger (CFA) piles which will provide the foundation for the new reinforced concrete river wall.

Mackley is currently installing new steel sheet piles – which will form part of the improved river wall.

The new steel piles are 16m long and are installed using a piling press, which allows the piles to be installed without disturbing the adjacent existing structures.

Returning to Shoreham

Between 2016 and 2019, Mackley was responsible for carrying out a major tidal defense scheme in Shoreham – significantly reducing flood risk to thousands of properties.

The defenses cover 1.8km on the east bank of the River Adur between Coronation Green and the A27 road bridge – and 5.4km on the west bank between the river mouth and the A27 road bridge.

They are formed of embankments, sheet pile walls, rock revetments, flood glass, and property level protection, and are designed to last for 100 years – though have been built so that they can easily be further raised after 50 years if necessary.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago