Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Wood Island Dredging Proposal on the Table
Business & Finance

May 18, 2020 · about 6 years ago

Wood Island Dredging Proposal on the Table

The U.S. Army Corps of Engineers, New England District is proposing to perform maintenance dredging of the Wood Island and Pool at Biddeford Federal Navigation Project (FNP) in Biddeford, Maine. The proposed work involves maintenance dredging of portions of the 10-foot-deep Mean Lower Low Water (MLL

1 minutes read
  • LinkedIn
  • X
  • Email
Wood Island Dredging Proposal on the Table

The U.S. Army Corps of Engineers, New England District is proposing to perform maintenance dredging of the Wood Island and Pool at Biddeford Federal Navigation Project (FNP) in Biddeford, Maine.

The proposed work involves maintenance dredging of portions of the 10-foot-deep Mean Lower Low Water (MLLW) Federal navigation channel and 6-foot-deep basin at Biddeford Pool, plus 1 foot authorized overdepth, in the FNP.

“ Maintenance dredging of approximately 39,000 cubic yards of fine-grained sand and 6,000 cubic yards of silt from approximately 8.4 acres of the authorized project area will restore the inner harbor portion of the FNP to authorized dimensions, ” said Project Manager Craig Martin , of the Corps’ New England District, Programs/Project Management Division in Concord, Massachusetts.

The proposed nearshore placement site for the fine sand removed from the FNP is a rectangular 10-acre site situated offshore of Camp Ellis Beach.

The proposed placement site for the silt removed from the FNP is the Saco Bay Disposal Site (SBDS), which is located approximately 4 nautical miles northeast of the FNP and 2.7 nautical miles east of Ferry Beach.

Construction is expected to take between 3 to 4 months between Nov. 1 and March 31 of the year or years in which funds become available.

The deadline for sending public comments on this proposed dredging is June 14, 2020.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business & Finance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago

DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

The final countdown: Preparing for OEEC 2025
Business & Finance

The final countdown: Preparing for OEEC 2025

about 8 months ago
DEME’s nine-month turnover tops 3 billion euros
Business & Finance

DEME’s nine-month turnover tops 3 billion euros

about 8 months ago