Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Conrad to build TSHD for GLDD
Conrad to build TSHD for GLDD

Great Lakes Dredge & Dock Corporation (GLDD) announced today the execution of a definitive contract for the construction of a 6,500-cubic-yard-capacity trailing suction hopper dredge.

With expected delivery in the 1st quarter of 2023, the vessel will complement the company’s existing six-dredge hopper fleet, including the ATB Tug Douglas B. Mackie and 15,000-cubic-yard-capacity barge Ellis Island.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business developmentEquipmentInfrastructureTechnologyVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

10 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago

Lasse Petterson , Chief Executive Officer and President commented, “As the leader in the US Dredging industry, Great Lakes continues to strategically invest in its dredging fleet. This highly automated new build vessel will increase the capabilities of our hopper fleet in the coastal protection and maintenance markets as well addressing specific needs in the growing offshore wind market.”

GLDD hired Conrad Shipyard of Morgan City, LA for the construction of the new vessel, with an option to build an additional dredge, should market conditions warrant.

Conrad will perform the detail design and construct the dredges at its Amelia, LA location based on a regulatory-level design provided by Great Lakes’ in-house engineering department in collaboration with C-Job Naval Architects.

According to the company, the innovation endures with the construction of this new vessel, with a hopper capacity of 6,500 cubic yards, supporting the modernization and diversification of GLDD’s dredging fleet.

The dredge will feature two 800mm suction pipes and will be able to dredge at depths of up to 100 feet, with principal dimensions of approximately 346 feet in length, 69 feet in breadth and 23 feet in depth and total installed horse power of 16,500.

The newbuild will be well-suited to multi-use applications on various project types. It will be deployed for channel deepening, maintenance dredging, beach nourishment, and coastal restoration projects with short to medium distance transport requirements.

The dredge will be equipped with a direct high power pump-ashore installation, dredging system automation, dynamic positioning and tracking, US EPA Tier IV compliant engines, and additional features designed to minimize the impact of its dredging process on the environment.

Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

10 days ago

Business development

June 9, 2020 · about 6 years ago

Conrad to build TSHD for GLDD

Great Lakes Dredge & Dock Corporation (GLDD) announced today the execution of a definitive contract for the construction of a 6,500-cubic-yard-capacity trailing suction hopper dredge. With expected delivery in the 1st quarter of 2023, the vessel will complement the company’s existing six-dredge hopp

2 minutes read
  • LinkedIn
  • X
  • Email

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins