A repair package of works up to £10 million has been proposed for the Lower River Aire washlands that were affected by devastating floods.
Since the flooding in February, Environment Agency staff have inspected and maintained 130km of river banks and identified more than 40 locations on the lower River Aire that require repair work due to the damage caused during last autumn and winter.
