Van den Herik and NGE-Guintoli recently won a contract from EDF (Electricité de France) for preparing the dismantling of the ‘La Roche Qui Boit’ dam on the Sélune River.
The 15m high and 125m long dam holds a reservoir that occupies about 30ha of land and contains 1.5 million m3 of water.
