The U.S. Army Corps of Engineers, Buffalo District has resumed Buffalo South breakwater construction operations to repair 625 feet out of the 1,000 foot degraded section, and is scheduled for completion in the fall 2020.
The contractor, Ryba Marine Construction, started construction work July 2019 to December 2019 before they stopped operation due to winter weather conditions.
