Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Construction of the General Bradley in full progress
Equipment

August 2, 2020 · about 6 years ago

Construction of the General Bradley in full progress

Callan Marine has announced construction commencement of the General Bradley, a new 28” dredge that will join the fleet in 2021. The General Bradley is diesel-electric driven and will have three ABC 12DZC engines installed with a total of 9,260 horsepower. At 341’ in length with a 6.6’ draft, the Ge

1 minutes read
  • LinkedIn
  • X
  • Email
Construction of the General Bradley in full progress

Callan Marine has announced construction commencement of the General Bradley, a new 28” dredge that will join the fleet in 2021.

The General Bradley is diesel-electric driven and will have three ABC 12DZC engines installed with a total of 9,260 horsepower.

At 341’ in length with a 6.6’ draft, the General Bradley will focus on brown water division projects and is ideally suited for both maintenance and capital dredging projects, said Callan in its release.

“The General Bradley is a demonstration of our commitment to capital improvement projects along the Gulf Coast region,” stated Maxie McGuire , President of Callan Marine. “The Bradley will transcend our ‘middle market’ offering and truly be a difference-maker in large river and ship channel dredging.”

The General Bradley will join the ranks of Callan Marine’s other dredges: the 32” General MacArthur, the 18” General Pershing, the 16” General Patton, and the 12” General Eisenhower.

The dredge General Bradley is being built by Hagler Systems at the Halimar Shipyard in Morgan City, Louisiana, with the main engineering of the dredge design and supplying of key dredge components by APT Offshore BV.

Construction is already in full progress and the dredge is anticipated to begin work in early 2021.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago