After almost fourteen years, the Boskalis Environmental has successfully completed the Fox River Cleanup Project.
This project in Green Bay, Wisconsin is one of the largest US sediment remediation projects.

After almost fourteen years, the Boskalis Environmental has successfully completed the Fox River Cleanup Project.
This project in Green Bay, Wisconsin is one of the largest US sediment remediation projects.
Dredging Today is read by thousands of professionals every day.
Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.
Join thousands of industry professionals who start their day with our newsletter.
The scheme consisted of dredging, processing and capping of PCB-contaminated sediment from the riverbed.
The job of Boskalis Environmental was to design, build and operate the processing facility.
Special about this project is that during the works over 4.5 million cubic meters of dredged sediment was pumped via an inline pipeline system straight into the facility for processing.
The facility separated a total of 800,000 tons of sand from the dredged material, which has been beneficially reused in local infrastructure projects.
about 2 months ago
about 6 years ago
After almost fourteen years, the Boskalis Environmental has successfully completed the Fox River Cleanup Project. This project in Green Bay, Wisconsin is one of the largest US sediment remediation projects. The scheme consisted of dredging, processing and capping of PCB-contaminated sediment from th