Royal IHC has successfully completed a pre-feasibility study (PFS) for a proposed mobile concentrator plant that will be based at Eramet’s Grande Côte operation in Senegal.
The objective of the PFS was to design and develop cost estimates for a 1,000tph relocatable process plant, capable of producing a heavy mineral concentrate, while recovering the required volumes of titanium and zircon.
