Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Preparations underway for Spring Harbor dredging
Infrastructure

January 6, 2021 · about 5 years ago

Preparations underway for Spring Harbor dredging

The City of Madison, WI, is currently working on preliminary plans, cost estimate, grant applications, permits, etc. for the upcoming Spring Harbor Dredge Project. Spring Harbor is due for maintenance dredging because users of the public boat launch and adjacent residents are having trouble launchin

1 minutes read
  • LinkedIn
  • X
  • Email
Preparations underway for Spring Harbor dredging

The City of Madison, WI, is currently working on preliminary plans, cost estimate, grant applications, permits, etc. for the upcoming Spring Harbor Dredge Project.

Spring Harbor is due for maintenance dredging because users of the public boat launch and adjacent residents are having trouble launching boats.

The hydrographic survey from May 2020 shows the average depth of the harbor is 2.5 feet.

City Engineering is working with the City Parks Department on a dredge plan to remove sediment/ debris to clear out 8 feet below summer minimum lake level of Lake Mendota (849.6 feet NGVD29 Datum).

Dredging limits are to be determined by funding.

Project limits include entire length of Spring Harbor channel from Lake Mendota Drive to Lake Mendota. Width will be a minimum of 25’ on either side of the channel centerline. A wider width will also be determined by funding.

Project Schedule

Tentative schedule is September to December 2021.

“We are looking to avoid closing the harbor during boating season, but will need to dredge before the harbor freezes,” the city said.

“There are a number of points of contact during this project where the public is encouraged to give feedback as part of public information meetings and public hearings.”

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

12 days ago