Despite winter conditions, work continues on the L-536 levee setback south of Rock Port, Missouri.
According to the Army Corps, repairs to the original in-line portion of the levee are scheduled to be substantially complete within the next month. Construction of the levee setback portion of the project continues despite the freezing temperatures.
