Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Another dredger joins Astrakhan branch fleet
Infrastructure

January 22, 2021 · about 5 years ago

Another dredger joins Astrakhan branch fleet

FSUE “Rosmorport” Astrakhan branch recently added two more vessels to its dredging fleet, the North-West–503 dredger of the R-36 project and the ShS–74 self-propelled scow of the R-122 project. Due to the reception of these vessels, the dredging fleet of the Astrakhan branch increased up to 6 vessel

2 minutes read
  • LinkedIn
  • X
  • Email
Another dredger joins Astrakhan branch fleet

FSUE “Rosmorport” Astrakhan branch recently added two more vessels to its dredging fleet, the North-West–503 dredger of the R-36 project and the ShS–74 self-propelled scow of the R-122 project.

Due to the reception of these vessels, the dredging fleet of the Astrakhan branch increased up to 6 vessels, and now the branch operates 33 vessels for various purposes.

Previously, the two vessels were operating for the FBI “Administration of the Volga-Baltic Basin of Inland Waterways” and in accordance with the orders of Rosmorrechflot the vessels were transferred to the economic management of Rosmorport.

The North-West–503 dredger belongs to the class of multibucket dredging vessels. It is a double-deck vessel with a joint placement of the engine room and the main distribution frame and a separate control superstructure.

The bucket plant – with a bucket chain consisting of 33 scoopers, each with a capacity of 0.7 cubic meters – has an average capacity of 550 cubic meters per hour and can operate with bottom soils of I-V classes at depths from 3 to 10 meters.

The ShS–74 self-propelled scow is a single-deck vessel with a stern location of the superstructure and engine room, with a hold of 300 cubic meters capacity. The scow is equipped with bottom doors (sleds) for unloading dredged material into the underwater dump.

According to Rosmorport, the Astrakhan branch is planning to use the dredging convoy in 2021 for works on the 155-160 km section of the Volga-Caspian Sea Shipping Canal (VCSSC).

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

InfrastructureVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

11 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

11 days ago