Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Rotech Subsea wraps up Scotland job
Technology

February 12, 2021 · about 5 years ago

Rotech Subsea wraps up Scotland job

Subsea, trenching and excavation pioneer, Rotech Subsea, has completed a dock entrance silt clearance and pile de-burial scope at one of the north of Scotland’s most strategic ports. Rotech Subsea mobilized its next generation RS2 Controlled Flow Excavation (CFE) and Suspended Jet Trenching tool to

2 minutes read
  • LinkedIn
  • X
  • Email
Rotech Subsea wraps up Scotland job

Subsea, trenching and excavation pioneer, Rotech Subsea, has completed a dock entrance silt clearance and pile de-burial scope at one of the north of Scotland’s most strategic ports.

Rotech Subsea mobilized its next generation RS2 Controlled Flow Excavation (CFE) and Suspended Jet Trenching tool to carry out the dispersal of silt that had accumulated along the dock sill gate at one of Scotland’s most important energy industry facilities.

The RS2 was also used for the de-burial of four piles at the port to allow cutting operations.

Rotech Subsea was contracted to provide its RS2 CFE tool for dispersal of silt that had accumulated along the dock sill gate. The RS2 operated in depths of up to 15m.

“The project was a success with multiple passes carried out, with the RS2 clearing 0.6m in depth of silt across the 120m dock entrance. The RS2 also cleared 5.5m of sand from a natural sandbank to the east of the gate entrance allowing for easier access for incoming vessels,” the company said.

The RS2 tool was also deployed for the de-burial of four piles to enable cutting operations. Each pile was de-buried to 3m in depth and 8m in width with an approximate evacuation time of 3 minutes per pile.

Also, Rotech Subsea recently completed a critical quayside stress testing scope at the Liverpool2 Container Terminal in Merseyside, England. Rotech Subsea was contracted by BAM International to carry out the bespoke testing and monitoring project at Peel Port’s new deep-water container terminal at the Port of Liverpool, which gives the largest container vessels from overseas direct access to the heart of the UK.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Technology

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

12 days ago
Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

13 days ago