Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Steel cutting ceremony for new GLDD dredger
Equipment

February 19, 2021 · about 5 years ago

Steel cutting ceremony for new GLDD dredger

Conrad Shipyard, Morgan City, La., hosted a steel cutting ceremony for Great Lakes Dredge & Dock Corporation (GLDD) at its Deepwater South shipyard in Amelia on February 5, 2021. The ceremony signals the start of construction of a 6,500 cubic yard trailing suction hopper dredger (TSHD). Delivery of

2 minutes read
  • LinkedIn
  • X
  • Email
Steel cutting ceremony for new GLDD dredger

Conrad Shipyard, Morgan City, La., hosted a steel cutting ceremony for Great Lakes Dredge & Dock Corporation (GLDD) at its Deepwater South shipyard in Amelia on February 5, 2021. The ceremony signals the start of construction of a 6,500 cubic yard trailing suction hopper dredger (TSHD).

Delivery of the vessel is scheduled before the end of Q2 in 2023, said Conrad in their latest release.

Addressing an audience of Conrad and GLDD managers, shipyard workers and guests, David Simonelli , Great Lakes Chief Operating Officer, said that the long-standing relationship between the two companies is stronger than ever.

“The steel cutting for this new hopper dredge is an important milestone for Great Lakes as we strategically invest in our fleet capacity to meet the nation’s maritime infrastructure needs,” he said.

“We are proud to partner with Conrad in the construction of this state-of-the-art Jones Act-compliant vessel which when operational will rebuild and protect our shorelines, deepen and maintain shipping channels and help restore Louisiana’s eroded barrier islands and marshes.”

The dredger will feature two 800mm suction pipes and will be able to dredge at depths of up to 100 feet.

The vessel has principal dimensions of approximately 346 feet in length, 69 feet in breadth and 23 feet in depth, and total installed horsepower of 16,500.

The new dredger will be well-suited to multiuse applications on various project types. It will be deployed for channel deepening, maintenance dredging, beach nourishment, and coastal restoration projects with short to medium distance transport requirements.

According to Conrad, the dredger will be equipped with a direct high-power pump-ashore installation, dredging system automation, dynamic positioning and tracking, US EPA Tier IV compliant engines, and additional features designed to minimize the impact of its dredging process on the environment.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago