Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Spotlight on Straatman’s bow discharge coupling
Equipment

February 23, 2021 · about 5 years ago

Spotlight on Straatman’s bow discharge coupling

Straatman, manufacturer and supplier of mooring, berthing and dredging equipment, is currently working on a bow discharge coupling, which will be installed on an oil recovery and dredging vessel. When not tending to emergencies it will work as a hopper dredger. “We execute both engineering and produ

2 minutes read
  • LinkedIn
  • X
  • Email
Spotlight on Straatman’s bow discharge coupling

Straatman, manufacturer and supplier of mooring, berthing and dredging equipment , is currently working on a bow discharge coupling, which will be installed on an oil recovery and dredging vessel.

When not tending to emergencies it will work as a hopper dredger.

“We execute both engineering and production of this bow discharge coupling in our factory in Zwijndrecht,” Straatman said.

The unit, with an inside diameter of 900 mm, will consist of a fixed female part and a separate male coupling part with integrated floating body.

“A cool item of this system, which is often underexposed, is the rainbow nozzle which is provided next to the gantry construction. Although on a dredger the rainbow unit might look like a tiny little thing, this component still weighs 4700 kg,” the company said.

Parts of the bow coupling

The bow coupling realizes the connection between ship and floating pipe line.

The coupling itself consists of a female- and male part. The female part is fixed to the bend of the discharge pipe and the loose male part has to be mounted to the floating hose. The female part is provided with hydraulic operated cylinders for opening/closing of the retaining ring and securing the lock pins.

The retaining ring clamps or releases the male part when it is positioned in the female part.

Heavy lock pins secure the retaining ring when the male part is connected.

The floater of the male part is a heavy duty construction and standard foam filled. The male part of the flexible coupling has an unlimited rotation.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

15 days ago