Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›Trialling a new approach to beach replenishment in Poole Bay
Research & Development

February 25, 2021 · about 5 years ago

Trialling a new approach to beach replenishment in Poole Bay

The Environment Agency has presented a report of the trial tests of a new approach to beach replenishment at Poole Bay. The report revealed results of a year-long programme of fieldwork to monitor the behaviour of sand deposited in the nearshore zone off Canford Cliffs in Poole Bay. The technique of

2 minutes read
  • LinkedIn
  • X
  • Email
Trialling a new approach to beach replenishment in Poole Bay

The Environment Agency has presented a report of the trial tests of a new approach to beach replenishment at Poole Bay.

The report revealed results of a year-long programme of fieldwork to monitor the behaviour of sand deposited in the nearshore zone off Canford Cliffs in Poole Bay.

The technique of replenishing beaches by deposition sand in the nearshore (sub-tidal) area is widely used in the Netherlands, but the project in Poole Bay was the first trial of the method in the UK. The material used was from maintenance dredging in Poole Harbour and thus was beneficial use of sediment that would otherwise have been dumped at sea.

The trial included 30,000m3 of material dredged from Poole Harbour that was deposited on the seabed approximately 350m offshore of Shore Road, Canford Cliffs. Hopper dredger Magni-R was used to discharge sand at the deposition site

Some 14 months after deposition, the mounds remained distinct features, approximately 2m high. The sediment had remained in situ, with a net loss of only ~1,000m3 (~3%) since deposition. Such small net volumes of sediment change are difficult to identify even from high precision bathymetric and topographic surveys, said EA in the report.

Although a sediment transport connection between the nearshore and the adjacent beach was proved (that is, nearshore deposition can replenish the beach), it remains difficult to assess the long-term fate of the material.

It is likely that both a larger quantity of material and more time are needed for sediment dispersal at this site to demonstrate long-term viability of nearshore replenishment as an alternative to traditional methods.

The Poole Bay nearshore beach replenishment trial monitoring was commissioned under the Flood and Coastal Erosion Risk Management Research and Development Programme (Project SC130035), funded by Defra, the Environment Agency and the Welsh Government, with additional contributions from the Borough of Poole, New Forest District Council (Channel Coastal Observatory) and SCOPAC (Standing Conference on Problems Associated with the Coastline).

To access the full report, please click here .

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Research & Development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

DEME’s Environmental segment reports EUR 200M turnover
Business development

DEME’s Environmental segment reports EUR 200M turnover

about 8 months ago

Enhancing biodiversity at Hengistbury Head by Boskalis
Research & Development

Enhancing biodiversity at Hengistbury Head by Boskalis

about 8 months ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

DEME’s Environmental segment reports EUR 200M turnover
Business development

DEME’s Environmental segment reports EUR 200M turnover

about 8 months ago
Enhancing biodiversity at Hengistbury Head by Boskalis
Research & Development

Enhancing biodiversity at Hengistbury Head by Boskalis

about 8 months ago