Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Record of decision signed for Mississippi River mainline levees SEIS II
Operations & Maintenance

March 14, 2021 · about 5 years ago

Record of decision signed for Mississippi River mainline levees SEIS II

The U.S. Army Corps of Engineers (USACE) has signed the Record of Decision for the Mississippi River mainline levees Final Supplemental Environmental Impact Statement II. The Record of Decision details USACE’s decisions on conducting remedial measures necessary to control seepage and/or raise and st

1 minutes read
  • LinkedIn
  • X
  • Email
Record of decision signed for Mississippi River mainline levees SEIS II

The U.S. Army Corps of Engineers (USACE) has signed the Record of Decision for the Mississippi River mainline levees Final Supplemental Environmental Impact Statement II.

The Record of Decision details USACE’s decisions on conducting remedial measures necessary to control seepage and/or raise and stabilize deficient sections of the existing levees and floodwalls to protect the structural integrity and stability of the MRL system, as well as measures to avoid and minimize adverse impacts and compensate for unavoidable losses to significant environmental resources.

Through evaluation of information and data obtained from levee inspections, seepage analyses, research, studies and engineering assessments, the USACE Memphis, Vicksburg and New Orleans districts collectively identified a total of 143 additional Work Items along various reaches of the Mississippi River mainline levees (MRL) feature of the MR&T project.

These 143 Work Items constitute the proposed action for the Final SEIS II and are located across portions of seven states: Illinois, Missouri, Kentucky, Tennessee, Arkansas, Mississippi and Louisiana.

The Final SEIS II supplements and, as necessary, augments the 1976 FEIS and 1998 Supplemental EIS (SEIS I) to achieve USACE’s primary goals for the MR&T: (1) providing flood risk management from the Project Design Flood; and (2) being an environmentally sustainable project.

The Record of Decision was signed by Maj. Gen. Diana Holland, Commanding General, USACE Mississippi Valley Division.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago