Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Lincolnshire beach scheme begins next month
Operations & Maintenance

March 17, 2021 · about 5 years ago

Lincolnshire beach scheme begins next month

Work to reduce the risk of flooding for Lincolnshire’s coastal communities is set to begin next month (April 2021) with the yearly replenishment of sand on beaches between Saltfleet and Gibraltar Point. The Environment Agency’s annual beach management scheme sees sand dredged from licensed areas of

1 minutes read
  • LinkedIn
  • X
  • Email
Lincolnshire beach scheme begins next month

Work to reduce the risk of flooding for Lincolnshire’s coastal communities is set to begin next month (April 2021) with the yearly replenishment of sand on beaches between Saltfleet and Gibraltar Point.

The Environment Agency’s annual beach management scheme sees sand dredged from licensed areas of the seabed and pumped onto the beach to replace levels naturally lost to the sea throughout the year.

The EA has been restoring sand levels on the Lincolnshire coast every year since 1994. In addition to reducing flood risk, the work brings supplementary social and economic benefits by retaining the sandy beaches for a vibrant tourism industry.

Dredging is expected to begin in April, after the Easter school holidays. The access road to Huttoft Car Terrace from Roman Bank will be closed from 22 March until 27 March for equipment to be safely delivered and a site compound to be set up.

The replenishment work is predicted to take six to seven weeks, with more than 400,000 cubic metres of sand pumped back onto beaches between Saltfleet and Gibraltar Point, including at Trusthorpe, Mablethorpe, Ingoldmells, Trunch Lane, Wolla Bank, Chapel Six Marshes and Huttoft.

Earlier in March, Van Oord and the Environment Agency signed a new contract to continue protecting the Lincolnshire coast of the UK for the next four years.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago