Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Wellington Harbour dredging about to start
Business development

April 20, 2021 · about 5 years ago

Wellington Harbour dredging about to start

CentrePort is about to begin removal of a build-up of sand in Wellington Harbour to ensure shipping has sufficient depth to operate, improving safety and efficiency. According to CentrePort General Manager Logistics, Mark Thompson, ridges of sand have built up over several years in two areas of the

1 minutes read
  • LinkedIn
  • X
  • Email
Wellington Harbour dredging about to start

CentrePort is about to begin removal of a build-up of sand in Wellington Harbour to ensure shipping has sufficient depth to operate, improving safety and efficiency.

According to CentrePort General Manager Logistics, Mark Thompson , ridges of sand have built up over several years in two areas of the shipping channels in the entrance to the harbour and need to be removed to improve the safe and efficient movement of vessels.

“The build-up has been caused by propeller wash in two areas located in stretch of water between Pencarrow Head and Seatoun which means deep draft ships are having to deviate from the usual entry and exit routes,” he said.

“Removing the sand will return the harbour to its original depth in those two areas allowing ships to use the established entry and exit shipping lanes.”

The Dutch Dredging company vessel Albatros will do the work which is scheduled to begin Thursday, 22 April, and take three-to-six days to complete.

“Wellington is the busiest shipping harbour in New Zealand with more than 7000 commercial vessel movements (inter-island ferries, container vessels, fuel tankers, bulk cargo vessels) every year,” said Thompson.

Approximately 22,000 cubic metres of sand will be removed to return the channels to their previous depth.

The sand will be deposited at a site near CentrePort’s Thorndon Container Wharf – previously used for depositing dredged material from the berths at Aotea Quay following the 2016 Kaikoura earthquake.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago