Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›$2.2M for Duck (NC) beachfill efforts
Operations & Maintenance

April 29, 2021 · about 5 years ago

$2.2M for Duck (NC) beachfill efforts

The Federal Emergency Management Agency (FEMA) has announced that the Town of Duck will receive $2,229,342 to assist their Hurricane Dorian recovery efforts. Dorian’s storm surge and wave activity led to dangerous levels of beach and dune erosion along the coastline near Duck, reported FEMA. The tow

1 minutes read
  • LinkedIn
  • X
  • Email
$2.2M for Duck (NC) beachfill efforts

The Federal Emergency Management Agency (FEMA) has announced that the Town of Duck will receive $2,229,342 to assist their Hurricane Dorian recovery efforts.

Dorian’s storm surge and wave activity led to dangerous levels of beach and dune erosion along the coastline near Duck, reported FEMA.

The town will use these funds to replace 170,800 cubic yards of sand along 1.6 miles of shoreline and dunes. About 61,000 plants will also need to be reinstalled to anchor the dunes against further erosion.

The project is expected to cost a total of $2,972,456 and will be a continuation of the Shoreline Protection Project that Duck initiated in 2017.

Congressman Greg Murphy , M.D. commented: “For small communities like Duck big storms can be especially devastating. Outer Banks natives are unfortunately all too familiar with natural disasters.”

“We must remember that North Carolina’s beaches are for locals and tourists alike. Preserving them needs to be a priority. Thankfully they were able to initiative recovery efforts on their own. With these funds Duck can continue to rebuild,” added congressman Murphy.

Sand for the restoration will be dredged from the same location they started using in 2017 – a 12.8 million cubic yard patch of sand approximately 5.75 miles off the coast of Kill Devil Hills.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago