Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Flood protection project in Hamburg kicks off
Operations & Maintenance

May 9, 2021 · about 5 years ago

Flood protection project in Hamburg kicks off

The US Army Corps of Engineers, Omaha District Commander Col. Mark Himes joined local, state and federal representatives last week for a groundbreaking ceremony to mark the start of the raising of the Ditch 6 Levee in Hamburg, Iowa. During the ceremony, the leaders spoke about the challenges of reco

1 minutes read
  • LinkedIn
  • X
  • Email
Flood protection project in Hamburg kicks off

The US Army Corps of Engineers, Omaha District Commander Col. Mark Himes joined local, state and federal representatives last week for a groundbreaking ceremony to mark the start of the raising of the Ditch 6 Levee in Hamburg, Iowa.

During the ceremony, the leaders spoke about the challenges of recovering after the flooding, and expressed their hopes for continued cooperation in the future.

This levee was overtopped and sustained severe damage during the 2019 floods, so an additional eight feet will be added. This will significantly increase the flood risk management benefits the levee provides to the city.

This significant achievement comes after the Omaha District, City of Hamburg, and other stakeholders have worked diligently with Headquarters USACE and Northwestern Division to implement the Section 1176 Authority from the 2016 Water Resources Development Act.

This is the first project across the nation to utilize the Section 1176 authority to raise the height of a federal levee system.

Section 1176 allows a levee sponsor, at their cost, an avenue to raise the elevation of a levee above its current congressionally authorized elevation after developing engineering drawings and completing studies demonstrating that the modified levee will not produce adverse impacts as a result of the raise.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago