Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Supplemental EA and FONSI for Depoe Bay Maintenance Dredging
Infrastructure

June 1, 2021 · about 5 years ago

Supplemental EA and FONSI for Depoe Bay Maintenance Dredging

The USACE Portland District has finalized the Depoe Bay Maintenance Dredging Supplemental Environmental Assessment (SEA) in Lincoln County, Oregon and signed a Finding of No Significant Impact (FONSI). The SEA and FONSI were prepared in accordance with the National Environmental Policy Act (NEPA), t

1 minutes read
  • LinkedIn
  • X
  • Email
Supplemental EA and FONSI for Depoe Bay Maintenance Dredging

The USACE Portland District has finalized the Depoe Bay Maintenance Dredging Supplemental Environmental Assessment (SEA) in Lincoln County, Oregon and signed a Finding of No Significant Impact (FONSI).

The SEA and FONSI were prepared in accordance with the National Environmental Policy Act (NEPA), the Council on Environmental Quality’s NEPA regulations (40 CFR §§ 1500–1508), and the Corps’ NEPA regulations (33 CFR Part 230) .

The action analyzed in the SEA is maintenance dredging of the Depoe Bay Catch Basin located behind the South Depoe Bay Creek Sediment Check Dam and supplements the Environmental Assessment (EA), dated June 30, 2015, that disclosed maintenance dredging activities for the Depoe Bay entrance channel, boat basin, and catch basin.

The Corps revised the Proposed Action to include options of dewatering material from the Depoe Bay Catch Basin prior to dredging and transporting it via truck to an upland site approximately two miles away.

USACE has determined that the Proposed Action is not likely to result in significant impacts on the human environment, and therefore an environmental impact statement (EIS) will not be prepared.

The FONSI is included with the final SEA. The final SEA also includes a summary of comments received on the Draft SEA, said USACE.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago