Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Lincolnshire beach replenishment work complete for 2021
Operations & Maintenance

June 14, 2021 · about 5 years ago

Lincolnshire beach replenishment work complete for 2021

Van Oord has completed this year’s beach replenishment works that will reduce the risk of flooding for Lincolnshire’s coastal communities. The sand was pumped onto beaches between Saltfleet and Gibraltar Point, including at Trusthorpe, Mablethorpe, Ingoldmells, Trunch Lane, Wolla Bank, Chapel Six Ma

1 minutes read
  • LinkedIn
  • X
  • Email
Lincolnshire beach replenishment work complete for 2021

Van Oord has completed this year’s beach replenishment works that will reduce the risk of flooding for Lincolnshire’s coastal communities.

The sand was pumped onto beaches between Saltfleet and Gibraltar Point, including at Trusthorpe, Mablethorpe, Ingoldmells, Trunch Lane, Wolla Bank, Chapel Six Marshes and Huttoft.

In line with the client’s aim to achieve net zero carbon by 2030, trailing suction hopper dredger HAM 316 used a sustainable biofuel during this campaign. The feedstock for the biocomponent of the fuel is primarily used cooking oil, reported Van Oord.

The Environment Agency’s annual beach management scheme sees sand dredged from licensed areas of the seabed and pumped onto the beach to replace levels naturally lost to the sea throughout the year.

The EA has been restoring sand levels on the Lincolnshire coast every year since 1994.

Earlier this year, Van Oord signed a new contract with the Environment Agency to continue protecting the Lincolnshire coast over next four years.

The contract encompasses beach nourishment over the length of 20 kilometers and requires around 400,000 cubic meters of sand each year and continues the works Van Oord has been undertaking there since 2015.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago