Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›UKD ready for the next Port of Blyth dredging campaign
Operations & Maintenance

June 18, 2021 · about 5 years ago

UKD ready for the next Port of Blyth dredging campaign

Trailing suction hopper dredger UKD Marlin, one of six vessels belonging to the UK Dredging (UKD) fleet, is about to begin next round of the summer maintenance dredging operations in the Port of Blyth. According to the port officials, the campaign is expected to start on Friday 25th June 2021 and wi

2 minutes read
  • LinkedIn
  • X
  • Email
UKD ready for the next Port of Blyth dredging campaign

Trailing suction hopper dredger UKD Marlin, one of six vessels belonging to the UK Dredging (UKD) fleet, is about to begin next round of the summer maintenance dredging operations in the Port of Blyth.

According to the port officials, the campaign is expected to start on Friday 25th June 2021 and will continue for a period of approximately one week.

The maintenance dredging will begin at the port approaches, next to follow are the main navigational channel and operational commercial berths.

“This will include frequent trips to and from the spoil deposit ground approximately 3 miles ENE of the harbour East Pier and south bound past the wind turbine array,” said the Port of Blyth . “The works will be undertaken over a 24 hour period by the vessel ‘UKD ‘Marlin’ with latest information regarding the areas being dredged available on VHF Channel 12 (Blyth Harbour Radio).”

Maintenance dredging is undertaken annually to maintain charted depths and the port has a licence issued by the Marine & Fisheries Agency allowing all dredged material to be deposited in a licensed area.

Frequent silt sampling is undertaken in all dredge areas to ensure material is free from contamination and the port also operates its own tug/plough dredger, the Blyth Endeavour, that will assist the UKD Marlin in this dredging campaign.

The Blyth Endeavour is fitted with bed-levelling equipment, allowing for some movement of silt within the river without the need for intrusive dredging.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago