Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Brunswick Harbor Modification Study on display
Business development

June 21, 2021 · about 5 years ago

Brunswick Harbor Modification Study on display

The USACE Savannah District has prepared an Integrated Feasibility Report (IFR)/Environmental Assessment (EA) and a draft Finding of No Significant Impact (FONSI) for the Brunswick Harbor Modification Study (BHMS). Pursuant to the National Environmental Policy Act of 1969, the Corps had provided a 3

2 minutes read
  • LinkedIn
  • X
  • Email
Brunswick Harbor Modification Study on display

The USACE Savannah District has prepared an Integrated Feasibility Report (IFR)/Environmental Assessment (EA) and a draft Finding of No Significant Impact (FONSI) for the Brunswick Harbor Modification Study (BHMS).

Pursuant to the National Environmental Policy Act of 1969, the Corps had provided a 30-day public comment period on the draft IFR/EA beginning on June 9, 2020.

Since the conclusion of June 2020 public comment period, the Corps has updated the analysis in the IFR/EA to provide clarity and additional analysis related to the operations and maintenance (O&M) of the federal navigation channel and selected Alternative 8 as the recommended plan.

The IFR-EA presents the results of the study, an analysis of the impacts of the proposed measures on the environment, and an evaluation of the effects of continued O&M.

This study incorporates the 2020 South Atlantic Regional Biological Opinion (SARBO), replacing seasonal windows with a risk-based management approach, which considers risk to multiple species in any given area.

The initial widening will consist of about 500,000 cubic yards of dredging and will result in a negligible increase in annual operations and maintenance (O&M) dredging (about 1 percent). This study will also bring all dredging in line with the 2020 SARBO, balancing the needs of multiple species across the region.

The modification will widen the navigation channel in key locations to improve the maneuverability and efficiency of larger Roll-on/Roll-off vessels that are calling on the growing port of Brunswick.

The entire Integrated Feasibility Report and Environmental Assessment and draft FONSI can be read here.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

11 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

11 days ago