Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›City of Oceanside hosts workshop on sand replenishment study
Infrastructure

June 24, 2021 · about 5 years ago

City of Oceanside hosts workshop on sand replenishment study

The City of Oceanside Public Works Department will host a second virtual public workshop on June 30, at 6:00 p.m. to share the final results of the beach sand replenishment and retention feasibility study. A previous workshop was held on September 15, 2020 to outline the feasibility study and introd

1 minutes read
  • LinkedIn
  • X
  • Email
City of Oceanside hosts workshop on sand replenishment study

The City of Oceanside Public Works Department will host a second virtual public workshop on June 30, at 6:00 p.m. to share the final results of the beach sand replenishment and retention feasibility study.

A previous workshop was held on September 15, 2020 to outline the feasibility study and introduce six preliminary concepts and strategies to protect City beaches from the impacts of long-term shoreline erosion.

The meeting on June 30 will identify the beach replenishment/retention option.

According to the City, the final results will be presented to the City Council at a workshop on August 11, 2021 at 2:00 pm.

Sand Replenishment Efforts

The Department has initiated a feasibility study that seeks to develop a strategy to protect City beaches from the impacts of long-term shoreline erosion.

A consultant (GHD) was hired to perform a preliminary engineering evaluation and feasibility study to consider options for beach sand replenishment and/or retention devices to stabilize and enhance the beach widths in the City.

The goal of the study is to identify a beach replenishment/retention strategy that is environmentally sensitive, financially feasible and has a reasonable chance of being approved through the regulatory permitting process.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago