Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Victorian coastline deal for AW Maritime
Infrastructure

August 8, 2021 · about 5 years ago

Victorian coastline deal for AW Maritime

The Department of Environment, Land, Water and Planning (DELWP) is engaging AW Maritime to undertake a comprehensive condition inspection of coastal protection structures located on coastal Crown land along the Victorian coastline. AW Maritime’s coastal engineers assessed and recorded the overall co

1 minutes read
  • LinkedIn
  • X
  • Email
Victorian coastline deal for AW Maritime

The Department of Environment, Land, Water and Planning (DELWP) is engaging AW Maritime to undertake a comprehensive condition inspection of coastal protection structures located on coastal Crown land along the Victorian coastline.

AW Maritime’s coastal engineers assessed and recorded the overall condition and visible defects on 1,517 seawalls, revetments, groynes and breakwaters, including 78 structures which had not been previously recorded.

Damage recorded include missing materials such as planks missing from timber groynes and masonry rocks displaced from seawalls while defects including cracking, together with rot, decay and rust, were also prevalent in ageing structures.

As part of the Coastal Asset Condition Inspection Program, AW Maritime also collected Australia Height Datum (AHD) height surveys at 7,295 locations atop coastal protection structures adjacent to many communities along the Victorian coastline.

The site survey data was collected with the assistance of Gertzel Engineering Surveyors whom were engaged by AW Maritime for all the site surveys.

This data will provide a benchmark for any future structural movement as well as a framework for future overtopping estimates. Overtopping is one of many important characteristics determining the ultimate lifecycle of coastal protection assets before refurbishment, replacement or retreat becomes inevitable under the constant pressures of erosion, storms and sea level rise.

The condition reports and Australia Height Datum will be used by DELWP as part of their coastal works program.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago