Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›MacGregor cranes for America’s largest hopper dredge
Equipment

August 17, 2021 · about 5 years ago

MacGregor cranes for America’s largest hopper dredge

MacGregor, part of Cargotec, announced today that the company will deliver two large, 120 ft. double telescopic service cranes and one 50 ft. telescopic stores crane for a self-propelled hopper dredge. Currently being built for Manson Construction Co., the Frederick Paup will be the largest ever sel

2 minutes read
  • LinkedIn
  • X
  • Email
MacGregor cranes for America’s largest hopper dredge

MacGregor, part of Cargotec, announced today that the company will deliver two large, 120 ft. double telescopic service cranes and one 50 ft. telescopic stores crane for a self-propelled hopper dredge.

Currently being built for Manson Construction Co., the Frederick Paup will be the largest ever self-propelled trailing suction hopper dredge built in the USA and will operate all over the country.

The order was placed by Keppel AmFELS, Inc. and booked into Cargotec’s 2020 fourth quarter order intake. The cranes are planned to be delivered to the yard by the end of 2021, with commissioning and testing during 2022 prior to delivery of the dredge in spring 2023.

The larger service cranes are double telescopic cranes with a size of 80 ft length when stored and extend out to 120 ft. The Safe Working Load (SWL) for these cranes will be circa 3,900 lbs at 120 ft and 108,000 lbs at minimum reach.

The aft stores crane is a single telescopic crane with a size of 32 ft length when stored that extends out to 50 ft. This versatile model has been installed on a diverse range of vessels in recent years.

MacGregor worked with the vessel owner/operator, Manson Construction Co. of Seattle, WA, and the designer, Hockema Group, Inc. of Seattle, WA, during the earlier design stage of the project to provide crane models that fit their requirements and ensure the highest quality.

“Since day one, the MacGregor team has provided excellent support and engineering solutions for this project, and the cranes will be a great tool for our daily operations,” commented Jordan Brown , Project Manager, Manson Construction Company.

Leif Byström , Head of MacGregor’s Offshore Solutions Division, added “The active dialogue at an early stage in the project, together with the operator’s focus on high-quality equipment and reputable in-service support, are the reasons why MacGregor was selected to supply these robust cranes.”

The cranes will be built at MacGregor’s facility in Seattle, and the vessel will be built at Keppel AmFELS shipyard in Brownsville, Texas, USA.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

EquipmentVessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

EXCLUSIVE: Poland launches construction of Cape Pomerania
Business development

EXCLUSIVE: Poland launches construction of Cape Pomerania

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago
EXCLUSIVE: Poland launches construction of Cape Pomerania
Business development

EXCLUSIVE: Poland launches construction of Cape Pomerania

13 days ago