Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Removing contaminated dredged material from Averijhaven
Operations & Maintenance

August 23, 2021 · about 4 years ago

Removing contaminated dredged material from Averijhaven

Rijkswaterstaat has announced the start of preparatory work to remove the contaminated dredged material from the Averijhaven depot. This is necessary to transform the site on the sea side of the North Sea Canal into the Energiehaven. For the project, approximately 850,000 cubic metres of dredged mat

1 minutes read
  • LinkedIn
  • X
  • Email
Removing contaminated dredged material from Averijhaven

Rijkswaterstaat has announced the start of preparatory work to remove the contaminated dredged material from the Averijhaven depot.

This is necessary to transform the site on the sea side of the North Sea Canal into the Energiehaven.

For the project, approximately 850,000 cubic metres of dredged material will be removed from the depot and transported by ship to the National Depot De Slufter in Rotterdam where it will be stored permanently.

The Averijhaven depot was once built to temporarily store the contaminated dredged material from the North Sea Canal. According to Rijkswaterstaat, no new dredged material has been added there since 2012.

The work is set to begin in August, when a cutter suction dredger will be hoisted into the depot. The dredged material will be transferred via a pressure pipeline to a transport ship for transport to the National Depot De Slufter in Rotterdam. The work is expected to be completed in May 2022.

After removing the dredged sediment, the Averijhaven site will be transferred to the province of North Holland, the municipality of Velsen, Port of Amsterdam and Zeehaven IJmuiden.

This consortium will develop the Averijhaven site and the adjacent Tata Steel site into the Energiehaven. The new Energiehaven will make a significant contribution to the energy transition and the sustainability of the region.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago