Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Emergency repair work moves forward at Del Mar Bluffs
Infrastructure

September 5, 2021 · about 4 years ago

Emergency repair work moves forward at Del Mar Bluffs

SANDAG construction crews have reached another major milestone in repairing the Del Mar Bluffs. This work is part of a multi-phased project to ensure the integrity and safety of the nearby Los Angeles-San Diego-San Luis Obispo (LOSSAN) rail corridor. Crews successfully graded the bluffs; constructed

1 minutes read
  • LinkedIn
  • X
  • Email
Emergency repair work moves forward at Del Mar Bluffs

SANDAG construction crews have reached another major milestone in repairing the Del Mar Bluffs.

This work is part of a multi-phased project to ensure the integrity and safety of the nearby Los Angeles-San Diego-San Luis Obispo (LOSSAN) rail corridor.

Crews successfully graded the bluffs; constructed a keyway, or foundation, that strengthened the bluffs; and rebuilt the slope from the ground up.

“Stabilizing the Del Mar Bluffs is crucial to ensuring safe and reliable rail operations and creating a faster, fairer, cleaner transportation system through SANDAG’s 2021 Regional Plan,” said SANDAG Chair and Encinitas Mayor, Catherine Blakespear.

“The draft 2021 Regional Plan will help enact a long-term strategy to move the tracks completely off the bluffs, ensuring the LOSSAN corridor can continue to serve the San Diego region for generations to come.”

Following the completion of the recent improvements, crews will begin construction of a new seawall just south of 4th Street in the City of Del Mar.

The work will include drilling holes along the beach; placing piles, or underground support columns, in the holes; and reinforcing them with concrete.

Crews will later place wooden beams, or lagging, between the exposed portions of the piles to create the seawall.

According to SANDAG, this work is necessary to protect the base of the bluffs from sea level rise and erosion.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago