Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Beach recycling continues at South Hayling
Operations & Maintenance

September 8, 2021 · about 4 years ago

Beach recycling continues at South Hayling

Coastal Partners, part of Havant Borough Council, announced yesterday that they will continue beach recycling works along the South Hayling Frontage. As reported, the work will start on 13 September 2021 to ensure the beach is at design profile before the winter period. “While no storm events have o

1 minutes read
  • LinkedIn
  • X
  • Email
Beach recycling continues at South Hayling

Coastal Partners, part of Havant Borough Council, announced yesterday that they will continue beach recycling works along the South Hayling Frontage.

As reported, the work will start on 13 September 2021 to ensure the beach is at design profile before the winter period.

“While no storm events have occurred since the last works were undertaken in March, small-scale gradual erosion of the front face of the beach has been ongoing through wave action since this time,” said Coastal Partners. “By undertaking works in September we aim to complete well before the winter period to allow the beach time to gradually settle in to its’ profile before any winter storm events occur.”

Beach recycling is the movement of material from areas of beach build up to areas of erosion. This helps to restore beach levels and increase the standard of protection against flooding.

The project, fully funded by the Environment Agency, will carried out by the contractor, Les Searle Group.

The work will take place along the southern frontage of Hayling Island, with material extracted from the beach between the Coastguard Hut and Gunner Point and deposited along the residential frontage at Eastoke.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago