Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Converting M/V Capt John A. Graham to side cast dredge
Equipment

September 17, 2021 · about 4 years ago

Converting M/V Capt John A. Graham to side cast dredge

MOTAS Dredging Solutions has supplied the concept, detailed design services and hardware of the dredging installation for the conversion of the M/V Capt John A. Graham to a side cast dredge. Brice Civil Constructors is the operator of the dredge, which is currently in operation and doing extensive a

1 minutes read
  • LinkedIn
  • X
  • Email
Converting M/V Capt John A. Graham to side cast dredge

MOTAS Dredging Solutions has supplied the concept, detailed design services and hardware of the dredging installation for the conversion of the M/V Capt John A. Graham to a side cast dredge.

Brice Civil Constructors is the operator of the dredge, which is currently in operation and doing extensive agitation dredging in the Atchafalaya River near Morgan City in the USA.

The concept was to mount a large dredge pump with two drag arms on the deck of an Offshore Supply Vessel. Rather than pumping material into the hold of a hopper dredge, the vessel would pump the material back overboard.

“We supplied the concept & detailed design services and hardware of the dredging installation,” MOTAS said.

“Together with our partner Hagler Systems, the whole dredging installation was supplied to the shipyard, assembled and installed onboard.”

“We had mechanical challenges we had to overcome” added Brice Civil Constructors , “but we’ve been pumping now for nearly a year. The average volume we’ve pumped on a month-to-month basis is about 5 million cubic yards per month.”

The cost savings measured per cubic yard of material pumped are significant compared to cutterhead and hopper rates.

Hardware supplied together with their partner Hagler Systems includes:

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

14 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago