Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Roam crews busy at Lumsden Point
Business development

September 22, 2021 · about 4 years ago

Roam crews busy at Lumsden Point

Roam Marine is assisting TAMS with the design and installation of a landbacked wharf at Lumsden Point. The wharf is 59m x 22m with a retained height of 16.5m. According to their latest project update, the main piles are dia 1625mm and the anchor piles 1067mm. Roam Marine designed the two level pilin

1 minutes read
  • LinkedIn
  • X
  • Email
Roam crews busy at Lumsden Point

Roam Marine is assisting TAMS with the design and installation of a landbacked wharf at Lumsden Point.

The wharf is 59m x 22m with a retained height of 16.5m.

According to their latest project update, the main piles are dia 1625mm and the anchor piles 1067mm.

Roam Marine designed the two level piling frame to drive 11 of the main piles at a time supported on temporary piles.

Also, they designed the access and single level 5 pile gate on the barge for the anchor piles.

The wharf was built in 5 months.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago