Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Vessels›Keel laid for two cutter dredgers of Project 4395
Vessels

October 21, 2021 · about 4 years ago

Keel laid for two cutter dredgers of Project 4395

Public Joint Stock Company “Shipbuilding, Ship Repair Corporation” yesterday held a keel laying ceremony for two non-self-propelled cutter suction dredgers of Project 4395. The two vessels – ordered under the Comprehensive Plan for Modernization and Expansion of Core Infrastructure (CPMI) until 2024

1 minutes read
  • LinkedIn
  • X
  • Email
Keel laid for two cutter dredgers of Project 4395

Public Joint Stock Company “Shipbuilding, Ship Repair Corporation” yesterday held a keel laying ceremony for two non-self-propelled cutter suction dredgers of Project 4395.

The two vessels – ordered under the Comprehensive Plan for Modernization and Expansion of Core Infrastructure (CPMI) until 2024 – are being built for FSI Rechvodput.

According to the Federal Marine and River Transport Agency (Rosmorrechflot), the design of the newbuilds was developed by a Rostov based design bureau Stapel. The dredgers are intended for administrations of Russia’s IWW basins.

The dredgers of 700 cbm/h in capacity feature a removable set of cutting devises. They are designed for dredging sand, silt, sand and gravel mix, maintenance dredging in harbour basins and access channels and fairways.

A total of 7 vessels of this design are to be built. In June 2021, acceptance/delivery certificate was signed for the lead non-self-propelled suction hopper dredger of Project 4395 intended for the Kama Basin Administration of Inland Water Ways. Two more dredgers are under construction at other shipyards. Two dredgers that were laid down yesterday and two more to be built at other production facilities will complete this series.

Under the state contract, the construction of the duo is to be completed by the end of 2024.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Vessels

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago
Tender launched for Gioia Tauro dredging
Business development

Tender launched for Gioia Tauro dredging

13 days ago