Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Work starts on the Carnarvon One Mile Jetty project
Operations & Maintenance

November 10, 2021 · about 4 years ago

Work starts on the Carnarvon One Mile Jetty project

The Western Australia Department of Transport (DoT) has commenced site works on the Stage 1 of the Carnarvon One Mile Jetty project. The DoT recently engaged contractors to undertake the urgent work, required after the jetty suffered significant damage during Tropical Cyclone Seroja and engineers re

2 minutes read
  • LinkedIn
  • X
  • Email
Work starts on the Carnarvon One Mile Jetty project

The Western Australia Department of Transport (DoT) has commenced site works on the Stage 1 of the Carnarvon One Mile Jetty project.

The DoT recently engaged contractors to undertake the urgent work, required after the jetty suffered significant damage during Tropical Cyclone Seroja and engineers recommended the removal of all but the first 400 metres of the structure.

DoT Director of Coastal Infrastructure Donna West said that Ventia Australia has mobilised specialist equipment to Carnarvon before this week commencing the first phase of the jetty’s deconstruction.

“Initially, work will focus on a 400 metre section of the jetty extending from Pier 117, just before the shoreline, and see an excavator used to remove timbers before they are transported across the intertidal zone and along the beach to a sorting area near the Old Prawning Jetty,” Ms West said.

“As the project continues to deeper water next month, the excavator will be replaced with a backhoe dredge and a barge will be used transport the timbers to a temporary storage area at Carnarvon Boat Harbour,” Ms West added.

Overall, the $4.2 million Stage 1 works involve emergency deconstruction and salvation of the jetty from the intertidal section onwards (Pier 117 – 245) as well as recovering timbers that are hazards to safe navigation. Salvaged timbers from the jetty may be used in Stage 2 of the project.

Stage 2 will see the first 400 metres of the jetty rebuilt (Piers 1 – 71) with State Government funding of $4.5 million.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago