Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Royal IHC delivers key components for TSHD R.B. Weeks
Equipment

December 2, 2021 · about 4 years ago

Royal IHC delivers key components for TSHD R.B. Weeks

Last year, Royal IHC and Weeks Marine Inc. entered into a contract for the engineering and equipment delivery for the 6,540m³ TSHD R.B. Weeks, currently under construction at the Allanton premises of Eastern Shipbuilding Group, Panama City, Florida. This is an identical vessel to the Magdalen that w

2 minutes read
  • LinkedIn
  • X
  • Email
Royal IHC delivers key components for TSHD R.B. Weeks

Last year, Royal IHC and Weeks Marine Inc. entered into a contract for the engineering and equipment delivery for the 6,540m³ TSHD R.B. Weeks, currently under construction at the Allanton premises of Eastern Shipbuilding Group, Panama City, Florida.

This is an identical vessel to the Magdalen that was delivered in 2017.

On October 27th the IHC Dredge Equipment components were loaded on Lekstroom barge CHRISTINA and transported to the facilities of the Port of Rotterdam, Waalhaven.

In the meantime, other truckable- equipment, supplied by IHC DBS and external suppliers from IHC Holland, were gathered in warehouses in Rotterdam area.

Finally, on November 14th all the equipment was loaded on the MV Marsgracht, operated by dry cargo specialist Spliethoff, and is currently in transit to Panama City, FL. where it will be installed on board.

Key components

Like the Magdalen, the R.B. Weeks will be equipped with Royal IHC designed and built equipment, including the complete and highly efficient dredging installation, dredging automation and instrumentation, propulsion and main electrical system.

During the past year, those key components have been manufactured, assembled and shop tested in workshops all over the world.

Part of the equipment package (35 sea containers and the suction inlet section) have been sent in 6 separate shipments to the USA already.

In close collaboration with Weeks, it was decided that we would consolidate the out of gauge equipment in one single shipment. This would limit the transport costs for barge and crane rental for either party, said Royal IHC.

Technical services

Royal IHC will provide a number of technical services, including the assistance of its qualified engineers for inspection during installation of the delivered equipment at the shipyard, and support during start-up and commissioning of the dredger.

Those activities are scheduled for 2022 and early 2023.

The delivery of the R.B. WEEKS is scheduled for early 2023.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago