Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Largest ever Mandurah campaign completed
Operations & Maintenance

December 7, 2021 · about 4 years ago

Largest ever Mandurah campaign completed

Department of Transport Western Australia has just announced that a record amount of sand has been moved in the annual campaign to provide safe navigation at Mandurah Ocean Entrance and to widen the Town Beach. According to DoT, this was the largest ever campaign completed at Mandurah Entrance Chann

2 minutes read
  • LinkedIn
  • X
  • Email
Largest ever Mandurah campaign completed

Department of Transport Western Australia has just announced that a record amount of sand has been moved in the annual campaign to provide safe navigation at Mandurah Ocean Entrance and to widen the Town Beach.

According to DoT, this was the largest ever campaign completed at Mandurah Entrance Channel.

Department of Transport (DoT) Director Coastal Facilities Donna West said that the annual sand bypassing and replenishment project, funded by the State Government and City of Mandurah at a cost of $1.58 million, had recently been completed with the largest amount of material moved in one campaign being recorded.

“Approximately 220,000 cubic metres of sand had been excavated from Halls Head Beach and pumped eastward on to nearby Town Beach during the five-month project which is essential to maintain the entrance channel,” Ms West said.

It was originally estimated that bypassing at the Mandurah Ocean Entrance this year would move a larger than usual target volume of 170,000 cubic metres. The final volume was beyond expectations, but necessary to match the natural sand movement experienced along this section of coast.

Ms West added that work is also underway at the Dawesville Channel to restore a level seabed near the Port Bouvard Marina and Estuary Entrance.

“A tug pulling special equipment is being used to sweep the seabed, moving about 5,000 cubic metres of sand, flattening high points and filling lows,” Ms West said.

“The campaign will be completed prior to the peak holiday season and ensure safe navigation in the area before work starts on the annual channel bypassing program moving sediment northwards from Pyramids Beach to continue the natural movement of sand along the coast,” Ms West concluded.

Together, the Dawesville and Mandurah bypassing projects represent a $2.5 million investment in coastal management ensuring the safe navigation of the Peel Harvey Estuary and the protection of Mandurah’s beaches.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Operations & Maintenance

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago

New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Jan De Nul renovates water basin near Port of Ghent
Operations & Maintenance

Jan De Nul renovates water basin near Port of Ghent

about 1 year ago
New pipeline for Bandy Creek dredging works
Operations & Maintenance

New pipeline for Bandy Creek dredging works

about 1 year ago