Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business development›Deepening of Antwerp Europaterminal (VIDEO)
Business development

December 21, 2021 · about 4 years ago

Deepening of Antwerp Europaterminal (VIDEO)

Antwerp Port Authority has asked Witteveen+Bos to investigate the possibility of deepening and relocating the Europaterminal quay wall. The purpose of deepening the Europa Terminal is to accommodate ships with a larger draught. Hydraulic, sedimentological and morphological studies were conducted as

1 minutes read
  • LinkedIn
  • X
  • Email
Deepening of Antwerp Europaterminal (VIDEO)

Antwerp Port Authority has asked Witteveen+Bos to investigate the possibility of deepening and relocating the Europaterminal quay wall.

The purpose of deepening the Europa Terminal is to accommodate ships with a larger draught.

Hydraulic, sedimentological and morphological studies were conducted as part of an environmental impact report (EIA). Various design variants were studied in order to provide insight into the effects of the design and of any maintenance dredging.

The study constisted of a desk study, data analysis and a hydrodynamic modelling study. Using various measurement series and extensive validation and calibration, a numerical model was created that provides reliable predictions. With this model, the effects of the deepening of the terminal on the environment were analysed.

Topics involved effects on water movement, morphology, salt intrusion and impact on environmentally valuable areas.

Based on these results, an optimized design was drawn as well as estimates of the needed maintenance dredging volumes. Finally, a management scenario was proposed for dredging and dumping activities.

An integral approach was used in all steps of this study. When assessing the effects, the nearby nature areas (including the brackish salt marshes) were carefully considered. This led to design adjustments that reduced the impact on the nature areas.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Business development

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago

PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Marinex wins Brunswick dredging contract
Business development

Marinex wins Brunswick dredging contract

12 days ago
PHOTO OF THE DAY: Maldon Harbor dredging in full swing
Business development

PHOTO OF THE DAY: Maldon Harbor dredging in full swing

12 days ago