Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Restoring Long Point Bayou with Calcasieu Channel dredge material
Infrastructure

January 19, 2022 · about 4 years ago

Restoring Long Point Bayou with Calcasieu Channel dredge material

Natural Resource Damage Assessment (NRDA) funds stemming from an oil spill incident will be funding a Louisiana Master Plan marsh creation and habitat project this year. The Louisiana Oil Spill Coordinator’s Office (LOSCO) reported this today at the monthly meeting of the Coastal Protection and Rest

1 minutes read
  • LinkedIn
  • X
  • Email
Restoring Long Point Bayou with Calcasieu Channel dredge material

Natural Resource Damage Assessment (NRDA) funds stemming from an oil spill incident will be funding a Louisiana Master Plan marsh creation and habitat project this year.

The Louisiana Oil Spill Coordinator’s Office (LOSCO) reported this today at the monthly meeting of the Coastal Protection and Restoration Authority (CPRA).

According to Louisiana CPRA, the Long Point Bayou Marsh Creation project in Cameron Parish is using $13.7 million in NRDA settlement funds resulting from environmental damages caused when two storage tanks at CITGO Petroleum Corporation’s Lake Charles Manufacturing Complex overflowed during a rainstorm in 2006.

Commenting the latest news, CPRA Executive Director, Bren Haase , said: “The restoration of this area will be a benefit to the Lake Calcasieu estuary and the fish, wildlife, and communities that depend on it.”

The project is set to restore approximately 400 acres of marsh in Long Point Bayou south of Hackberry.

The Long Point Bayou Marsh Creation Project was designed by CPRA in collaboration with the U.S. Environmental Protection Agency (EPA) with funding through the Coastal Wetlands Planning, Protection and Restoration Act (CWPPRA).

The project, located between LA Highway 27 and the Calcasieu Ship Channel, will create and nourish emergent brackish marsh using sediment dredged from the Ship Channel.

CPRA said that USACE will advertise for construction this summer in conjunction with maintenance dredging of the Ship Channel.

Construction will last approximately one year.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago