Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›VIDEO: Constructing dredge pipeline with bare hands
Equipment

January 19, 2022 · about 4 years ago

VIDEO: Constructing dredge pipeline with bare hands

Bunnal Tech has just released this unbelievable video showing a man constructing a dredge pipeline with his bare hands. Hydraulic dredgers work by sucking a mixture of dredged material and water from the channel bottom. The amount of water sucked up with the material is controlled to make the best m

1 minutes read
  • LinkedIn
  • X
  • Email
VIDEO: Constructing dredge pipeline with bare hands

Bunnal Tech has just released this unbelievable video showing a man constructing a dredge pipeline with his bare hands.

Hydraulic dredgers work by sucking a mixture of dredged material and water from the channel bottom. The amount of water sucked up with the material is controlled to make the best mixture.

Pipeline and hopper dredges are the two main types of hydraulic dredges.

Pipeline dredgers suck dredged material through one end and push it out the discharge pipeline directly into the disposal site.

Hopper dredgers are vessels with large hoppers, or containment areas, inside. The dredger suctions dredged material from the channel bottom through long intake pipes and stores it in the hoppers.

When the hoppers are full, the dredged material is either pumped off through a pipeline or the vessel travels to an in-water disposal site, where the dredged material is discharged through the bottom of the ship.

Disposal site selection for dredged material is one of the most important and challenging parts of planning a dredging project.

The most common disposal methods are beach renourishment, ocean placement and confined disposal facilities.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago