Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Infrastructure›Meeting on Seagirt Loop Channel Deepening set for February 24
Infrastructure

February 11, 2022 · about 4 years ago

Meeting on Seagirt Loop Channel Deepening set for February 24

The USACE Baltimore District, in coordination with the Maryland Department of Transportation Maryland Port Administration (MDOT MPA), is holding a public meeting February 24 to provide information on the Seagirt Loop Channel Deepening Feasibility Study draft Integrated Feasibility Report and Environ

1 minutes read
  • LinkedIn
  • X
  • Email
Meeting on Seagirt Loop Channel Deepening set for February 24

The USACE Baltimore District, in coordination with the Maryland Department of Transportation Maryland Port Administration (MDOT MPA), is holding a public meeting February 24 to provide information on the Seagirt Loop Channel Deepening Feasibility Study draft Integrated Feasibility Report and Environmental Assessment (EA).

The study examined navigation efficiencies and transportation cost savings that could be gained by improving the Seagirt Loop Channel to better accommodate the ultra large container vessels, or “Post-Panamax vessels”, calling at SMT.

These vessels can carry twice the cargo capacity and require deeper water depths than the ships that were used to design the current access channels to the SMT and have a greater risk of grounding, collision, allision, and marine casualties.

Along with these risks, efficiency delays have resulted in limitations to operations within Baltimore Harbor.

The study area includes 32-square miles of Baltimore Harbor, including the navigable parts of the Patapsco River below Hanover Street, the Northwest and Middle Branches, and Curtis Bay and its tributary, Curtis Creek, as well as the associated Port.

USACE and MDOT MPA will present two proposed plans detailed in the draft report;

The draft Integrated Feasibility Report and EA is available to the public for a 30-day review and comment period.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Infrastructure

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago

Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Maryland DNR provides funding for 24 public boating projects
Business development

Maryland DNR provides funding for 24 public boating projects

13 days ago
Queensland Government: Upper Warrill Creek flood resilience project begins
Canal Dredging

Queensland Government: Upper Warrill Creek flood resilience project begins

13 days ago