Dredging Today
JobsNewsletter
Topics
  • Authorities & Government
  • Beach Nourishment
  • Berth Expansion
  • Breakwater Construction
  • Breakwater Construction & Repair
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Equipment›Straatman bow discharge assembly: Work in progress
Equipment

February 11, 2022 · about 4 years ago

Straatman bow discharge assembly: Work in progress

After completing delivery of a 50 ton bow discharge coupling unit to Damen Dredging Equipment late last year, Straatman BV is putting finishing touches to another bow discharge project. One of the projects that the company is working on at present is a 25 ton bow discharge unit for a well known Amer

1 minutes read
  • LinkedIn
  • X
  • Email
Straatman bow discharge assembly: Work in progress

After completing delivery of a 50 ton bow discharge coupling unit to Damen Dredging Equipment late last year, Straatman BV is putting finishing touches to another bow discharge project.

One of the projects that the company is working on at present is a 25 ton bow discharge unit for a well known American shipyard. Production of this giant started in 2021 and delivery of the unit is scheduled for May this year.

According to the company, the bow discharge installation will have an inside diameter of ø762 mm and a maximum working pressure of 20 bar.

“Currently we are working on a number of dredging projects for various customers: a bow discharge assembly Ø762 mm, 7 pcs. pinch ball joints Ø762mm, bow coupling ø500 mm, female part for bow coupling ø1000 mm, female part for pinch ball joint ø700 mm and a female part for pinch ball joint ø1000 mm,” Straatman said.

The company also added that they are proud that all of the top dredging companies worldwide still find their way to Zwijndrecht, the Netherlands for their dredging equipment.

The bow coupling installation for hopper dredgers realizes the connection between ship and floating pipe line.

This installation is designed for efficient beach and land reclamation. Quick connection and low maintenance ensure safe working under almost all circumstances and tough weather conditions.

Reach the Dredging Today industry in one go!

Dredging Today is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Filed under

Equipment

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1VIDEO: Italdraghe SGT 200 CSD raises the bar in Guyana
  2. 2Manson nabs $12.9M Oakland dredging deal
  3. 3Maryland DNR provides funding for 24 public boating projects
  4. 4Queensland Government: Upper Warrill Creek flood resilience project begins

Related articles

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago

Daily news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ōpōtiki Marina development project backed by RIF investment
Business development

Ōpōtiki Marina development project backed by RIF investment

13 days ago
BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2
Business development

BREAKING NEWS: Van Oord consortium selected as preferred proponent for Roberts Bank Terminal 2

14 days ago